Kebble Environmental Services HVAC Commissioning | Management | Water Treatment – Tel: 01279 417 878

150 Cheapside, London EC2

A brand new London headquarters for a number of prestige companies, this new 8 storey building in a City of London is located opposite St Paul's Cathedral.

Systems were chemically cleaned and flushed on a floor by floor, core by core basis, using temporary flushing rigs in accordance with BSRIA recommendations and Chesterfield Water Treatments site specific methodology. Due to previous issues with the systems the processes included additional steps of 5 Day Biocide/Tracer Wash, Biocide/Tracer introduction into terminal units and Ammoniated Citric Acid cleaning, again with introduction into coils.

All water treatment, air and water commissioning was undertaken on this project.